Padma Multipurpose Bridge Project-River Training

Client: Sinohydro Corporation Limited.
Project Owner: Bangladesh Bridge Authority (BBA)
Project Value In Million ($): 1005

MEGHNAGHAT 718MW COMBINED-CYCLE POWER PLANT

DHAKA AIRPORT TERMINAL 3 CONSTRUCTION PROJECT

GHORASHAL PALASH UREA FERTILIZER PROJECT

MEGHNAGHAT 400/230 KV AIS SUBSTATION

BNS SHEIKH HASINA BASE PROJECT

SUMMIT MEGHNAGHAT 583 MW POWER PLANT

UNIQUE 588MW CCPP PROJECT

ROOPPUR NUCLEAR POWER PLANT

DHAKA ELEVATED EXPRESSWAY

METRO RAIL PROJECT

Bangabandhu Sheikh Mujibur Rahman Tunnel Project

HVDC BHERAMARA PROJECT

BIBIYANA III 400 MW POWER PLANT

PADMA MULTIPURPOSE BRIDGE PROJECT MAIN BRIDGE (PARTIAL)