DHAKA AIRPORT TERMINAL 3 CONSTRUCTION PROJECT

The airport is located in Kurmitola, 11 nautical miles (20.37 kilometres; 12.66 miles) north of the downtown Dhaka. It can be accessed by the eight-lane Airport Road. To the north of the airport lies Uttara area and Gazipur city, while Dhaka city lies to its south. There is a railway station immediately outside (facing) the airport named Airport Railway Station.


The airport mainly consists of three major terminals. Terminal 1 (T1) and Terminal 2 (T2) are for international flights and they are both located within the same building. T1 is located on the ground floor and it is used as the international arrivals concourse hall. T2 is located on the upper floor and it serves as the international departures concourse hall. A third adjacent terminal building, known as the Domestic Terminal, is for domestic flights. This is located to the left of the international terminals. In the one-storey Domestic Terminal, both the arrivals concourse hall and the departures concourse hall are on the same floor.


A third international terminal is under construction and it is expected to be operational in 2023. According to the project design, the third terminal will have 12 boarding bridges and 12 conveyor belts. The terminal will have 115 check-in counters, 59 immigration desks.


A VIP terminal building is located to the right of the international terminals. The VIP terminal is built only about 200 metres (220 yards) from the main gate.


There is a cargo terminal at the airport which has a capacity of 200,000 tons per annum. This will be increased to 500,000 tons after the completion of the huge ongoing renovation and expansion project.


Project Name: Dhaka Airport Terminal-3 Construction Project.

Project Owner: Civil Aviation Authority, Bangladesh.

Contractor Name: Samsung C&T

Logistic Partner: Deugro (Korea) Pvt. Ltd.

Project Value: US $ 2535 Million.


Service Rendered:

Customs Clearance, Port & Offshore Cargo Handling, Multimodal Transportation.

MEGHNAGHAT 718MW COMBINED-CYCLE POWER PLANT

GHORASHAL PALASH UREA FERTILIZER PROJECT

MEGHNAGHAT 400/230 KV AIS SUBSTATION

BNS SHEIKH HASINA BASE PROJECT

SUMMIT MEGHNAGHAT 583 MW POWER PLANT

UNIQUE 588MW CCPP PROJECT

ROOPPUR NUCLEAR POWER PLANT

DHAKA ELEVATED EXPRESSWAY

METRO RAIL PROJECT

Bangabandhu Sheikh Mujibur Rahman Tunnel Project

HVDC BHERAMARA PROJECT

BIBIYANA III 400 MW POWER PLANT

PADMA MULTIPURPOSE BRIDGE PROJECT MAIN BRIDGE (PARTIAL)

Padma Multipurpose Bridge Project-River Training