MEGHNAGHAT 718MW COMBINED-CYCLE POWER PLANT



Meghnaghat 718 MW Combined-Cycle Power Plant is a significant asset in Bangladesh's energy infrastructure, helping to enhance energy security, promote economic development, and meet the country's electricity needs.

 

The Meghnaghat Power Plant is situated in the Meghnaghat Industrial Complex, which is located in the Narayanganj district of Bangladesh, some 25km southeast of the Bangladeshi capital of Dhaka. It will generate electricity to power the industrial complex as well as residential homes in nearby towns and cities, including Dhaka itself.

 

This is a project to build a 718MW combined cycle power plant consisting of two gas turbines, one steam turbine, two heat-recovery boilers, and a substation. In total, it is valued at USD 630 million (KRW 750 billion). Samsung C&T was awarded the contract for this project as an exclusive contractor and will spend 34 months from October 2019 to July 2022 working on it.

 

Project Name:             Meghnaghat 750 MW Combined Cycle Power Plant

Project Owner:           Reliance Bangladesh LNG and Power Project

Contractor Name:     Samsung C&T

Logistic Partner:        Deugro (Korea) Pvt. Ltd.

Project Value:             US $ 900 Million


 

Service Rendered:

Customs Clearance, Port & Offshore Cargo Handling, Multimodal Transportation, Jetty Construction (RORO & LOLO) with 1000 TON Capacity, ODC Handling, Inter Carting and Lifting to Foundation Area.

DHAKA AIRPORT TERMINAL 3 CONSTRUCTION PROJECT

GHORASHAL PALASH UREA FERTILIZER PROJECT

MEGHNAGHAT 400/230 KV AIS SUBSTATION

BNS SHEIKH HASINA BASE PROJECT

SUMMIT MEGHNAGHAT 583 MW POWER PLANT

UNIQUE 588MW CCPP PROJECT

ROOPPUR NUCLEAR POWER PLANT

DHAKA ELEVATED EXPRESSWAY

METRO RAIL PROJECT

Bangabandhu Sheikh Mujibur Rahman Tunnel Project

HVDC BHERAMARA PROJECT

BIBIYANA III 400 MW POWER PLANT

PADMA MULTIPURPOSE BRIDGE PROJECT MAIN BRIDGE (PARTIAL)

Padma Multipurpose Bridge Project-River Training