HVDC BHERAMARA PROJECT

HVDC (High voltage direct current) Bheramara Project is one of the key energy infrastructural projects in Bangladesh which seeks to boost power output by promoting cross-border power exchange with India. First, it was 500 MW (megawatts) and further could reach 1000 MW scale.

 

The Power Development Board, Bangladesh (BPDB) carried out the project in association with Power Grid Corporation of India Limited (PGCIL). ABB was one of the prime contractors in the construction of the HVDC substation.

 

Technical Aspects:


Technology: HVDC technology was selected for such reasons as it has low energy losses when transmitting power over long distances as compared to AC (Alternating Current) transmission.

Converter Station: As for the Bheramara HVDC substation, the facility functions as a converter station, that transforms the AC electricity to DC electricity for long-distance transmission and then converts the DC electricity back to AC electricity for distribution in Bangladesh.

 

Economic Impact:

·          It plays an essential role in improving Bangladesh's energy security by operationalizing non-domestic fossil-based power plants.


The purchase of power from India can be cheaper than the production of electricity from costly imported fuels, so it can prove to be a cheaper avenue for the country.


Electric power is one of the necessities for industries, and the HVDC Bheramara project plays an important role in Bangladesh’s burgeoning industrial sector where electricity demand is increasing day by day.


The project also enhances the flow of economic relations between Bangladesh and India and contributes to the South Asian integration process.

 

The project aids in the delivery of the government’s mission of attaining electricity for all citizens as well as quality living standards and the economy.

 

HVDC Bheramara Project has become one of the significant factors in Bangladesh’s energy security plan and development vision for future economic progress.

 

Project Name: HVDC Bheramara Project.

Project Owner: Power Grid Company of Bangladesh.

Contractor Name: SIEMENS AG, GERMANY.

Logistic Partner:

Project Value: US $ 250 Million.

 

Service Rendered:

Customs Clearance, Multimodal Transportation, Jetty Construction, Offloading & Placement of Foundation.

 

MEGHNAGHAT 718MW COMBINED-CYCLE POWER PLANT

DHAKA AIRPORT TERMINAL 3 CONSTRUCTION PROJECT

GHORASHAL PALASH UREA FERTILIZER PROJECT

MEGHNAGHAT 400/230 KV AIS SUBSTATION

BNS SHEIKH HASINA BASE PROJECT

SUMMIT MEGHNAGHAT 583 MW POWER PLANT

UNIQUE 588MW CCPP PROJECT

ROOPPUR NUCLEAR POWER PLANT

DHAKA ELEVATED EXPRESSWAY

METRO RAIL PROJECT

Bangabandhu Sheikh Mujibur Rahman Tunnel Project

BIBIYANA III 400 MW POWER PLANT

PADMA MULTIPURPOSE BRIDGE PROJECT MAIN BRIDGE (PARTIAL)

Padma Multipurpose Bridge Project-River Training